Power System Studies (PSS)

Arc Flash (AF) Analysis

Arc flash incidents release intense thermal energy and pressure, creating serious hazards for personnel working on energised electrical equipment.

Why it matters

Know the hazard before someone opens the door

An arc flash assessment establishes incident energy levels across the distribution system and the protective boundaries that follow from them.

The output is not a document for the shelf. It is the labelling and guidance that qualified personnel rely on at the panel.

Arc flash risk assessment

Evaluate the distribution system to determine incident energy levels and establish protective boundaries wherever personnel face electrical hazards.

Labelling and documentation

Receive labels and supporting documentation so qualified personnel understand the hazard and can work safely near energised equipment.

Actionable reports

Findings include incident energy calculations, PPE recommendations and practical guidance for improving electrical safety.

Arc Flash (AF) Analysis

Facility Consulting

Power System Studies (PSS)

In detail

What the work actually involves

Detailed arc flash risk analysis

The assessment evaluates incident energy and arc flash boundaries across the system while reviewing alignment with NFPA 70E requirements.

Know when a review is required

Tracking five-year update cycles and facility expansions helps organisations protect personnel and limit liability through proactive engineering review.

Predictive incident energy modelling

Using distribution data and computational models, fault clearing times are evaluated to establish boundaries and produce accurate equipment labels.

Talk to an expert

How we deliver

Local field work, specialist analysis

In collaboration with Schneider Electric.

01

Our collaborative delivery approach

nuValence provides local field support while Schneider Electric Consulting Services applies specialised engineering expertise for the analysis and technical recommendations.

02

Why choose nuValence

Accurate labels depend on accurate field data, collected locally and calculated by specialists.

Ready to start with Arc Flash (AF) Analysis?

Tell us what you are seeing on site and we will bring the right engineering support.