Starting performance
Confirm the motor can accelerate successfully without excessive voltage drop, so it reaches speed reliably every time.
Power Quality Studies
Evaluate motor starting performance across the equipment lifecycle, from design validation and commissioning through ongoing operations and future expansion.
Why it matters
A motor drawing locked-rotor current is the most demanding thing most distribution systems ever see.
The analysis confirms the motor can accelerate successfully, and that everything else connected survives the attempt.
Confirm the motor can accelerate successfully without excessive voltage drop, so it reaches speed reliably every time.
Assess how the motor affects transformers, generators, connected equipment and other facility loads during startup.
Results guide starting method, equipment sizing, utility requirements and any system modifications needed.

Facility Consulting
Power Quality StudiesIn detail
Voltage fluctuation from motor startup can disrupt sensitive electronics and control systems elsewhere in the facility, far from the motor itself.
The study determines whether standby or prime generators can support the starting current while holding acceptable voltage and frequency.
Motor starting studies support expansion by evaluating how new motors will interact with the electrical infrastructure already in place.
How we deliver
In collaboration with Schneider Electric.
Beyond the study, nuValence can coordinate equipment selection, procurement, local installation resources, commissioning and ongoing technical support.
Analysis that carries through to implementation, rather than a report that stops at the recommendation.
Related
Understand how your facility's electrical system performs through rapidly deployable monitoring, detailed power quality analysis, and load profile verification.
02Specialised engineering analysis to evaluate, validate and optimise electrical system harmonic performance, with support from Schneider Electric Consulting Services.
03Evaluate switching transients throughout the equipment lifecycle to support system design, commissioning, operational reliability and future infrastructure modifications.
04Evaluate how your electrical system responds to faults, switching events and changing operating conditions to improve reliability and maintain system stability.
Tell us what you are seeing on site and we will bring the right engineering support.